Bespoke bags developed for luxury brands, showing specification discipline and finishing detail

Why Choose Us

The differences that matter in sourcing are unglamorous: who writes the specification, how fast a sample comes back, what standard the goods are inspected to, and whether the second season matches the first.

Six things distinguish this programme, and none of them is a slogan. The specification is written before the price is quoted; sampling runs six to ten working days on a sample room held apart from bulk; inspection is fixed at AQL 2.5 under ISO 2859-1 with in-process checks behind it; an approved material library governs what is cut; one named programme manager owns the outcome; and patterns, tooling and references are retained so a repeat season reproduces the first. This page sets out each in turn, with a factual comparison against the sourcing routes a brand might otherwise take.

Programme parameters at a glance

ParameterCommitment
Minimum order quantity500 pieces per style / colourway
Sampling lead time6–10 working days (12–15 days for complex constructions)
Bulk production lead time35–50 days after sample approval
Inspection standardAQL 2.5 (ISO 2859-1), single sampling, general level II
IncotermsFOB Xiamen — EXW, CIF and DDP available on request
Payment termsT/T 30% deposit / 70% before shipment; L/C at sight for container loads
Verified production floor space4,950 m² (SGS-verified)
Team137 staff across 7 production lines
Equipment149 machines including computerised saddle-stitch and edge-painting units
Monthly capacity200,000 pieces
EntityFounded 2014; principal has worked in bag development since 2004

Specification Discipline

Almost every dispute in this trade begins as an ambiguity. A gusset dimension left open, a hardware finish described in words rather than by reference, a lining named but never approved. The cost of resolving that ambiguity rises steeply with time: it is free on paper, cheap at sample stage, expensive at bulk and unrecoverable in a carton.

The programme therefore treats the written specification as the first deliverable, not the last. A drawing or a reference sample is converted into a tech pack before costing begins, so that the price and the bag describe the same object and any later change can be priced against a documented baseline rather than argued about.

Written before costingNo quote is issued against a photograph alone; the tech pack comes first
Materials named by referenceHides, linings and hardware identified against an approved sample, not a description
Tolerances statedDimensions carry an allowable range, so an inspection has something to measure against
Changes recordedEvery amendment is logged against the style reference with its cost and schedule effect
One version in circulationThe bench, the merchandiser and QC all work from the same document

Sampling Speed

Why Choose Us — production and finishing detail
Details are specified in the tech pack and confirmed in the pre-production sample.

Sampling is where a programme is won or lost, and speed here is structural rather than heroic. It comes from holding a sample room apart from the bulk lines, so prototype work is not displaced when production is busy, and from having pattern development in-house rather than outsourced to whoever is free.

StageStandard timingWhat governs it
Tech pack and material confirmationBefore sampling startsHow quickly a buyer answers the specification questions
First prototype, standard construction6 to 10 working daysPattern cut to the drawing; sample room held apart from bulk
First prototype, complex construction12 to 15 working daysFramed, moulded or hardware-intensive builds needing tooling or fitting trials
Revision after commentsOne further cycle at the same timingComments consolidated into a single document rather than arriving piecemeal
Approved counter sampleHeld as the bulk referenceWhat QC inspects against and what the buyer is entitled to receive
Bulk start35 to 50 days after approvalMaterial and hardware lead time, then line capacity

The honest caveat is that the clock starts when the specification is settled, not when the email arrives. A buyer who consolidates sample comments into one round protects the schedule far more effectively than one who sends observations daily.

Finished bespoke bag inspected against the approved reference sample before packing and release
Finished goods are checked against the approved reference sample, and inspection reports are issued against the order rather than verbal assurances.

Inspection Standard

An inspection standard is only useful if it is stated in full. "Checked before shipment" is not a standard; it is an intention. The programme applies AQL 2.5 under ISO 2859-1, single sampling, general level II, with critical, major and minor defects classified and counted separately, and with in-process checks behind the final one.

Incoming materialHides, linings and hardware checked against the approved reference before cutting
In-processLine-side inspection at sewing, assembly and finishing, logged against the operation
FinalRandom sampling to AQL 2.5, ISO 2859-1, single sampling, general level II
Reporting lineInspectors report to the programme manager and the buyer, not to the line being inspected
Third-party accessBuyer-appointed inspectors work on the floor with full access to records
DocumentationWritten reports retained against the order reference

AQL 2.5 is not an allowance of 2.5 per cent defective goods. It is an acceptance threshold applied to a defined sample, and the same figure applied to a different sample size produces a different acceptance number. Stating the sampling scheme and the inspection level is what makes a result reproducible rather than negotiable.

Material Library

Material decisions made late are the most common cause of a sample that cannot be repeated. The programme maintains an approved reference archive so that a hide, a lining and a hardware finish are things a buyer has held rather than adjectives a buyer has read.

Programme Accountability Compared With Typical Sourcing Routes

Buyers generally reach bespoke bags by one of three routes: direct to a production facility, through a sourcing intermediary, or through a development programme such as this one. Each has genuine advantages depending on what the buyer needs. Direct buying can be the most economical where a brand already holds its own specification and audit capability. A sourcing intermediary is efficient where speed and breadth of catalogue matter more than development. A development programme suits a buyer who needs a construction that does not yet exist.

DimensionDirect to a production facilityThrough a sourcing intermediaryThis programme
SpecificationUsually written by the buyer, or inferred from a supplied sampleOften a photograph or a translated briefWritten tech pack produced before costing and held by the programme manager
Sampling basisAdapted to existing tooling where the build allowsSourced from across a network of facilitiesCut to the drawing in-house, 6 to 10 working days, 12 to 15 for complex builds
Minimum quantitySet by the facility's own line economics and varies widelyNegotiated across the network500 pieces per style and colourway, with small-batch pilots available
InspectionThe facility's own standard unless the buyer specifies oneArranged, and the standard varies by orderAQL 2.5, ISO 2859-1, single sampling, general level II, with in-process checks
Cost visibilityUsually a unit priceUsually a landed quoteComponent-level breakdown against the specification
Second seasonSubject to the facility's tooling retention arrangementsTypically re-sourcedPatterns, tooling and approved references retained against the style
AccountabilityShared between buyer and facilityHeld by the intermediaryOne named programme manager owning specification, schedule and outcome

Repeat-Season Continuity

The first order proves a programme can be built. The second proves it can be repeated. Continuity is a records discipline more than a craft one: a pattern that has been archived, a tooling set that has been retained, an approved reference that has not been lost, and a team that remembers why a specification was written the way it was.

Patterns and toolingRetained against the style reference and available for the next run
Approved referencesPhysical material and hardware samples held for matching, not described from memory
Programme recordSpecifications, sample comments, inspection results and costings kept together
Cost stabilityA repeat can be quoted against a documented baseline rather than re-costed from scratch
Team continuityThe programme manager stays with the account across seasons

The practical effect is that a second season is a confirmation rather than a redevelopment. For a brand building a range rather than a one-off, that is usually the difference worth paying for.

Intellectual property, tooling and confidentiality

A development programme exposes more than a drawing. Patterns, component schedules, cost breakdowns and artwork change hands in the first few weeks, and a buyer is entitled to know exactly what happens to them. The position is simple to state: the buyer owns the design, the specification and the artwork; tooling the buyer pays for is theirs; and nothing developed for one programme is offered to another account.

Design ownershipPatterns, specifications and artwork developed for a brief belong to the buyer and are held against the style reference.
ToolingDies, moulds and plates are identified on the cost breakdown; tooling the buyer pays for is not reused elsewhere.
ConfidentialityProgramme files are held against the account, and a style developed for one buyer is not shown to another.
Stock componentsShared stock hardware and linings are declared as such, so exclusivity is stated rather than implied.
Reference retentionApproved swatches, strikes and sealed samples stay with the style and are returned or destroyed on request.
Sub-suppliersWhere a component comes from a specialist, that supplier is named once the programme is confirmed.

This is worth settling before the first sample, because it is the question that becomes awkward later. A buyer who knows which parts are exclusive and which are catalogue parts can plan a range with realistic expectations about what a competitor could also obtain, instead of discovering it after launch.

Communication cadence from first enquiry to shipment

Programmes rarely fail on capability; they fail on silence. A buyer waiting four days for an answer that takes four minutes is a buyer who starts copying other suppliers into the thread. The cadence below is what the programme commits to, and it holds whether the news is convenient or not.

One named contact throughout; escalation beyond them is internal rather than arranged by the buyer.
StageCadenceWho answersRecord produced
Enquiry to first responseWithin one working dayProgramme managerA questions list returned with the enquiry
Specification developmentBatched daily as questions ariseProgramme managerA dated specification version
SamplingStatus at every gate changeSample room, via the programme managerPhotographs alongside measurements
Costing changesSame day the change is requestedProgramme managerA revised breakdown against the baseline
Bulk productionWeekly, plus at any gateProduction coordinatorLine position and inspection dates
Pre-shipmentAt inspection and before bookingProgramme managerInspection report and packing data

The difficult half of this is bad news. A delay reported early can be planned around; the same delay reported late becomes an argument. The commitment is therefore about timing rather than tone — a material that will not arrive on time is reported the day that becomes known, not the day it was due.

Freight, documentation and the handover at port

Production finishing is not the same as goods being ready to sell. Between the last carton and a warehouse sit booking, documentation, inspection release and the handover itself, and each step produces a document that has to agree with the others. Most of the weeks lost in this trade are lost here rather than at the bench.

Terms are FOB Xiamen as standard; EXW, CIF and DDP can be coordinated through the logistics service.
Handover stepWho prepares itTimingWhat goes wrong
Packing list and carton marksProduction floor, against the orderBefore inspectionCarton marks not matching the warehouse system
Inspection releaseInspection at AQL 2.5, ISO 2859-1After pack-outRelease held for a defect graded too late
Commercial documentsProgramme teamBefore bookingValue or description not matching the import file
Booking and cut-offLogistics coordinatorAgainst the sailing scheduleA cut-off missed by a day costs a week
Origin and compliance filesProgramme team, against the orderWith the shipmentA certificate requested after the vessel sails
Handover at FOB XiamenProgramme team and the buyer's forwarderOn loadingThe responsibility boundary misunderstood

The cheapest improvement available is a document list agreed at costing rather than at the port. Knowing which declarations, origin files and certificates a destination requires — and who produces each one — removes the week that otherwise disappears between finishing production and loading the container.

Capacity, scheduling and peak-season planning

Capacity is a planning input rather than a boast. A buyer needs to know whether a programme can hold a slot in a busy quarter and what happens when two seasons collide. That answer is far easier to give when the seasonal pattern is shared early than when the order is already late.

Production floorAn SGS-verified 4,950 m² floor in Quanzhou, Fujian, with 137 staff, seven lines and 149 machines.
Stated capacityAround 200,000 pieces monthly across programmes, allocated by line rather than promised globally.
Slot disciplineA settled specification and a cleared deposit hold a production slot; a late specification releases it.
Peak quartersThe pre-Chinese New Year and pre-autumn windows fill first, so early booking protects the date.
Repeat advantageA repeat built from a retained pattern moves through the line faster than a new development.
Honest limitsA process the floor does not hold is placed with a production partner under the same specification, and the buyer is told.

Two practical protections follow from that. The first is to share a seasonal calendar rather than a single order date, because a slot reserved against a calendar survives a delay better than one reserved against a hope. The second is to treat the settled specification as the schedule: a programme whose specification is fixed early can absorb a late material, while one whose specification is still moving cannot absorb anything at all.

Practically, schedule risk concentrates in two dates: the day the specification is settled and the day the deposit clears. Everything after that is arithmetic — sampling at 6–10 working days, or 12–15 for a complex build, then 35–50 days of bulk after approval — and the programme would rather a buyer had the arithmetic early than an apology late. Send the seasonal pattern with the first enquiry through the contact page.

Put the specification first

Send a drawing, a tech pack or a reference sample. We will return the questions that need answering, an indicative cost breakdown and a sampling schedule, and we will tell you plainly if another route would serve you better.

Frequently Asked Questions

What makes your programme different from buying direct?

The specification is written and owned before costing, sampling is cut to the drawing in-house rather than adapted to existing tooling, inspection is fixed at AQL 2.5 under ISO 2859-1, and one named programme manager owns the outcome. Direct buying remains the most economical route where a brand already holds its own specification and audit capability.

Why do you insist on a written tech pack before quoting?

Because a price quoted against a photograph is a price for an undefined object. Ambiguity is free to resolve on paper, cheap at sample stage, expensive at bulk and unrecoverable in a carton. A written specification also lets a later change be priced against a documented baseline rather than negotiated from scratch.

How fast is sampling compared with other sourcing routes?

Six to ten working days for a standard construction and twelve to fifteen for complex builds, measured from specification being settled rather than from first contact. The speed is structural: a sample room held apart from bulk lines and in-house pattern development, rather than overtime at the bench.

What inspection standard applies, and can it be tightened?

The standard is AQL 2.5 under ISO 2859-1, single sampling, general level II, with critical, major and minor defects counted separately and in-process checks behind the final inspection. A tighter AQL or a different inspection level can be specified by the buyer where a programme justifies it.

Can you work below the 500-piece minimum?

The standard minimum is 500 pieces per style and colourway, which reflects line set-up and material yield economics. Small-batch pilots are available for first runs and for testing a market before committing to full volume; the small-batch service page sets out how those quantities work.

How does the material library work in practice?

Approved hides, linings, hardware and trims are retained as physical references against your style rather than described in writing. When a material becomes unavailable, the substitution is raised as a question before cutting rather than discovered in a finished carton, and the replacement is approved against the original.

Who is accountable if something goes wrong?

The programme manager assigned to your account. They own the specification, the schedule and the answer, and escalation beyond them is internal rather than something you have to arrange. Every specification, approval and inspection report is written and retained against the style reference.

Will a repeat order match the first one?

That is the point of retaining patterns, tooling and approved references against the style. A second season is quoted against a documented baseline and built from the retained pattern, so it reproduces the first run rather than redeveloping it, with the same programme manager on the account.

How transparent is your costing?

Costs are broken down by component against the specification, so a buyer can see where a price moves when a material, a hardware finish or a construction detail changes. Terms are FOB Xiamen as standard, with EXW, CIF and DDP available on request, and T/T 30 per cent deposit with 70 per cent before shipment.

Do you work with buyers who already have a supplier?

Yes, frequently. Some buyers keep an existing arrangement running while developing a new construction with us, and others use the programme for the categories where development matters and elsewhere for catalogue work. We are comfortable being one route among several.

What happens if you are not the right fit for a brief?

We say so before an order is taken. A brief calling for a process the Quanzhou floor does not hold, such as moulded shells or specialist plating, is placed with a production partner under the same specification and inspection standard, and the buyer is told which facility will run the programme before bulk begins.

How do you handle compliance documentation for different markets?

Documentation is collected with the order rather than assembled afterwards. Where a destination market requires it, REACH, CPSIA or OEKO-TEX material documentation is gathered against the order reference, and leather can be sourced from Leather Working Group audited tanneries where the brief calls for it.

How are intellectual property and tooling handled on a programme?

The buyer owns the design, specification and artwork. Tooling the buyer pays for is theirs, listed on the cost breakdown and not reused elsewhere, while stock components shared across programmes are declared as such. Approved swatches, strikes and sealed samples stay with the style and are returned or destroyed on request.